How much should a kitchen remodel cost?

A U.S. planning guide to using national kitchen-remodel benchmarks without mistaking them for a quote for your home.

Published October 4, 2026

By the HomeFAQ Editorial Team · Reviewed for accuracy.

https://homefaq.com/kitchen/how-much-should-a-kitchen-remodel-cost/

Kitchen remodel material samples on an island.

For a U.S. homeowner planning a major kitchen remodel, the 2025 Cost vs. Value Report lists a national average of $79,982 for its defined midrange major-kitchen-remodel project and $158,530 for its defined upscale major-kitchen-remodel project. Treat those as dated, national planning benchmarks—not a price range that a contractor must honor. They do not describe every kitchen, and they do not replace an on-site assessment or a written quote. A targeted update that keeps the layout and most systems can be a very different scope; a kitchen with layout changes, concealed damage, or extensive coordination can exceed a benchmark.

This guide is for a homeowner deciding whether a kitchen project is financially realistic and how to request comparable local proposals. Start by writing down the problem you need to solve, then ask qualified remodelers to price the same documented scope. The decision rule is simple: use national data to set a preliminary conversation, but choose a proposal only after you can see what it includes, excludes, and leaves unknown.

What the national benchmarks do—and do not—cover

The 2025 report’s midrange major-kitchen project is a specific 200-square-foot remodel with defined assumptions, including stock cabinets, laminate countertops, a double-tub sink, a standard-range appliance package, flooring, painting, and retained layout elements. Its upscale project uses a different defined scope and products. Those descriptions make the figures useful for understanding the scale of a major remodel, but they are not a menu of local prices.

The report is based on a modeled project description and regional data; your home can differ in size, access, local labor market, product selections, permit process, existing conditions, and the trades that must coordinate. As checked October 4, 2026, use its 2025 figures as the most recent published national planning reference cited here, and ask local professionals what has changed in your market. Do not convert the benchmark into a per-square-foot promise or assume it includes an item that is absent from a written scope.

The choices that move a kitchen-remodel proposal

A kitchen proposal commonly changes with these decisions and conditions:

Scope choice or condition Why it changes the proposal
Layout and appliance locations Moving cabinets, appliances, or fixtures can require design verification and coordination of related trades.
Cabinets and countertops Construction, finish, hardware, templates, fabrication, delivery, and installation details vary widely.
Existing conditions Water staining, uneven surfaces, old alterations, or other conditions may need investigation after work begins.
Utilities and ventilation Electrical, plumbing, gas, and ventilation work should be named by scope and assigned to a qualified trade where needed.
Demolition and protection Removal, disposal, dust control, floor protection, and access through the home should be explicit.
Allowances and selections An allowance is a placeholder amount. It is not a final product choice or a guarantee that the total will stay unchanged.

From a safe standing position, note approximate room dimensions, doors and windows, appliance and fixture locations, and visible staining or damage. Take photos and list what must stay usable during the project. Do not open walls, disconnect utilities, move gas appliances, or diagnose moisture or electrical conditions yourself. If water is actively leaking near electrical equipment, stop using the affected area when safe and seek qualified help promptly.

Turn a benchmark into a useful local quote comparison

Give each bidder the same brief: your goals, rough room dimensions, photos, must-have features, selections you have made, and items you are willing to treat as alternatives. Ask each proposal to identify these items as included, excluded, or still to be determined:

  • design or measurement verification and any drawings;
  • demolition, disposal, home protection, and cleanup;
  • cabinets, countertops, backsplash, flooring, fixtures, and appliance responsibilities;
  • electrical, plumbing, gas, HVAC, ventilation, painting, and wall-repair coordination;
  • permits and inspections if locally required, plus who confirms them;
  • allowances, schedule assumptions, payment terms, warranties, and written change orders.

The Federal Trade Commission recommends getting written estimates and understanding what a contract includes before hiring a contractor. A lower total may be a narrower scope, not a better value. If removal or measurement reveals a condition, ask the contractor to show and describe it, explain options, state the price and schedule effect, and get your written approval before extra work begins.

Local permit and inspection requirements vary. The International Code Council publishes model codes, but the authority having jurisdiction decides what applies at a specific address. Ask who will verify the local requirements instead of relying on a national article.

A practical next step

Keep one folder with your room notes, photos, selection list, each written proposal, and approved changes. First compare the scope line by line; then compare totals only after you know the same work is being priced. If cabinets are a central part of your project, continue with how much new cabinets can cost and how to plan a cabinet replacement project. Those guides can help you prepare the cabinet details that make a kitchen-remodel quote clearer.

Sources

Be ready for the conversation

3 questions to ask your kitchen remodeler

  1. 1Which demolition, protection, cabinet, countertop, appliance, utility, permit, cleanup, and warranty tasks are included or excluded in this written kitchen-remodel scope?
  2. 2Which layout, allowance, product-selection, access, or existing-condition assumptions could change this total, and how will you document the options?
  3. 3If measurement or demolition reveals a condition outside this proposal, how will you explain it and obtain my written approval before extra work begins?